Electric Vehicles

Port of Oakland orders 300 Tesla Semis, opens megawatt charging depot

WattEV depot can charge 25 trucks at 240 kW or seven at 1.2 MW. First trucks arrive by year-end, full fleet by 2027.

Port of Oakland orders 300 Tesla Semis, opens megawatt charging depot
Photo: Internet Archive Book Images · No restrictions (Wikimedia Commons)

How much will the Port of Oakland's 300-truck Tesla Semi order cost?

The Port of Oakland and charging provider WattEV opened a public heavy-duty charging depot Monday and announced plans to purchase 300 Tesla Semis, with the first units arriving before the end of 2026 and the remainder in 2027. Based on the reported $290,000 price for the 500-mile Tesla Semi, the fleet could represent roughly $87 million in vehicle purchases. WattEV has not disclosed its actual purchase price or the total cost of the Oakland charging depot.

What charging capacity does the Oakland depot provide?

The depot can charge 25 medium- and heavy-duty trucks simultaneously at up to 240 kilowatts each, or seven trucks at 1.2 megawatts each. The megawatt-charging design is intended to reduce charging stops to 30 minutes or less, a duration project officials describe as comparable to diesel refueling. The facility is the first of its kind in Northern California, according to officials at Monday's opening ceremony.

The project puts charging infrastructure in place ahead of the full fleet's arrival. Until now, most truck charging infrastructure has been concentrated in Southern California, according to WattEV. The Oakland depot is intended to help establish a zero-emission freight corridor connecting the Bay Area with Sacramento, the Central Valley, Nevada and other destinations.

What are the claimed operating costs?

WattEV said that, at current high diesel prices, the new electric trucks would cost about half as much to operate as comparable diesel models. The company did not provide a detailed cost breakdown in the announcement. Tesla Semi TCO now works outside California, according to the OEM, which is targeting Texas, Georgia, Illinois expansion in 2026 and Canada in 2027.

Who is backing the project?

The project brings together the Port of Oakland, the Bay Area Air District, Tesla and the California Air Resources Board, according to WattEV Chief Executive and co-founder Salim Youssefzadeh. Oakland Mayor Barbara Lee said community input helped shape the project, with an emphasis on ensuring that neighborhoods disproportionately affected by pollution benefit from investment at the port.

"We're seeing real progress in transforming how our industry moves goods to and from the Oakland Seaport," Port of Oakland Executive Director Kristi McKenney said at the port ceremony. "Together with our industry partners, we're delivering projects throughout Oakland that support cleaner freight operations, healthier communities, and a more sustainable future."

"Until now, most truck charging infrastructure has been concentrated in Southern California, and the options for electric trucks limited their capability," Youssefzadeh said. "We're thrilled to enable zero-emission freight transport from a key port like Oakland."

What this means for Northern California drayage

The 300-truck order represents a northward expansion of electric trucking infrastructure on the West Coast. The Oakland depot and fleet are designed to support zero-emission freight service across Northern California and beyond, with charging capacity sized to match freight schedules. The megawatt charging capability is critical for drayage operations, where trucks typically run multiple turns per day and cannot afford extended downtime.

The first batch of trucks is expected before the end of the year, with the remaining vehicles arriving in 2027. The staggered delivery schedule allows WattEV to phase in operations and test charging protocols before the full fleet is operational. Pilot and Tesla opened the first two heavy-duty truck charging sites in Georgia and California in October 2026, deploying similar megawatt charging infrastructure for Class 8 operations.

More from Hank Rivers